Without knowing the size of the proposed building, its difficult to assess completion time for the building. It all depends on the size of the plot, plan whether there is a basement or a podium or both or none. However, If all the permissions are in place and plans are sanctioned then a standalone building with basement or car parking floor/podium should take around 30/36 months for the completion.